Timberborn cover
Game Release Tracker

Timberborn

Release date September 15, 2021
Developer
Mechanistry
Publisher
Mechanistry
GMDB Rating
8.0/10
17 ratingsSign in to rate
RELEASE ALERTS
Overview

About Timberborn

Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.
Details

Game Details

Age Ratings

GRAC 12+ESRB EPEGI 3

PC Support

Operating systems
Windows, macOS
Performance

System Requirements

PC requirements.

Minimum

PC
OSWindows 10 or newer
Processor4-core 1.7 GHz or better
Memory8 GB RAM
GraphicsGeForce GTX 950, Radeon R9 380 or similar
DirectXVersion 11
Storage3 GB available space
Additional NotesRequires a 64-bit processor and operating system

Release Dates

Platform and region-specific release information.

PlatformRegionDate
MacworldwideSeptember 15, 2021
PC (Microsoft Windows)worldwideSeptember 15, 2021
MacworldwideMarch 12, 2026
PC (Microsoft Windows)worldwideMarch 12, 2026

Trailers

Official videos available for this game.

Trailer1 / 12

Screenshots & Artwork

Open any image and browse the gallery without leaving the page.

Community

Discussion

No comments yet.

Leave a comment

You are browsing as a guest. Enter your name and email address, or register.

Click on the image to refresh the code if it is illegible
Comments are published in accordance with the website rules. Rules